Note: the header mentions Burnside bridge but the body of the article talking about Broadway bridge instead which seems to be the actual bridge having inspections/closure. In the body it mentions the bike/foot section remaining open and the street car continuing to run, so it’s very likely the Burnside mention in the header is a typo.