  • Sure, if you are actually interested I can give you some basic examples. Lets take a look at some of the site details for a new build. Need to remove X yards of dirt - may require an engineer report. Ever see 100 yards of sidewalk/curb/gutter in the middle of no where - city requriement that will add $15k just for the concrete, let alone what you would need for retaining walls if there is a slope. If there is a mild slope to the lot - may need a different engineering report. Big developement - they will require land set aside that cant be developed for a wide varieties of things.