I’m in the process of wiring a home before moving in and getting excited about running 10g from my server to the computer. Then I see 25g gear isn’t that much more expensive so I might was well run at least one fiber line. But what kind of three node ceph monster will it take to make use of any of this bandwidth (plus run all my Proxmox VMs and LXCs in HA) and how much heat will I have to deal with. What’s your experience with high speed homelab NAS builds and the electric bill shock that comes later? Epyc 7002 series looks perfect but seems to idle high.

  • cmnybo@discuss.tchncs.de
    link
    fedilink
    English
    arrow-up
    5
    ·
    27 days ago

    The load on my UPS is around 100-140 watts. That includes my server, firewall, switch, starlink and a unifi access point. I would love to get that power consumption down. I only get 4-5 hours of runtime on battery. Also, the room it’s in is small and it gets really hot in the summer time.