[T]he report’s executive summary certainly gets to the heart of their findings.

“The rhetoric from small modular reactor (SMR) advocates is loud and persistent: This time will be different because the cost overruns and schedule delays that have plagued large reactor construction projects will not be repeated with the new designs,” says the report. “But the few SMRs that have been built (or have been started) paint a different picture – one that looks startlingly similar to the past. Significant construction delays are still the norm and costs have continued to climb.”

  • Resonosity@lemmy.world
    link
    fedilink
    English
    arrow-up
    9
    ·
    27 days ago

    I agree with all of this as an electrical engineer in the field. Base load is only base load because of the load profile of devices connected to the grid having either an on or off switch. Most of the time this means motors/HVACs, but the world of electronics is coming to that equipment just like how inverters have changed how we export solar PV and wind to the grid. VFDs, soft starters, and the like will make our industrial processes that much more efficient. We just need to spread awareness and ramp up implementation, just as much as for renewables themselves.